One of the main dilemmas of modern IT management — how to combine the flexibility of Agile development with strict budget constraints.
At first glance, these approaches seem mutually exclusive: Agile requires adaptability and readiness for change, while a fixed budget demands precise planning and cost control.
However, our experience shows that a proper combination of these approaches is not only possible but also provides significant advantages.
Let's consider proven strategies and real cases of successful implementation.
Planning problem
In the traditional approach, the budget is calculated based on a detailed technical specification.
Agile, on the other hand, assumes that requirements will be refined and changed during development.
How to plan a budget if the final result is unknown in advance?
Control problem
A fixed budget requires strict control of expenses and deviations.
Agile teams work iteratively, and the cost of each iteration may vary depending on task complexity.
Change problem
Clients often perceive a fixed budget as a guarantee of cost stability, even with significant changes in requirements.
Agile assumes that changes are the norm.
Principle of operation
The project is divided into a mandatory part (MVP — Minimum Viable Product) with a fixed budget and additional modules, which are implemented if budget remains or for an extra fee.
Case: Bulletin board with a news block for the diaspora
Task: Create a regional bulletin board with an up-to-date news block for the diaspora.
Budget: 21,500 euros — 6 months.
Solution:
Result: The basic platform was ready in 6 months exactly within budget. The client received a fully functional bulletin board with the ability to post by regions, personal accounts, moderation system, and automatic news loading. Additional stages are planned for implementation as the project develops.
Principle of operation
The budget is fixed, but buffers for unforeseen tasks are allocated inside.
The team works within strict time frames (time-box), but with flexibility within each sprint.
Case: Marketplace for a group of companies
Task: Create a fully functional online store with marketplace elements, including integration with 1C, personal accounts for sellers and buyers, mobile PWA application.
Budget: 71,558 euros (including VAT and discount), duration — 13 months.
Budget structure:
Mechanics:
Result: The project was completed on time thanks to the clear Meta-Sistem work process. The buffer covered additional SSL certificate configuration for multilingual support and the complication of delivery calculation logic, which were required after testing with the client’s real data.
1. Proper budget formation
2. Control and transparency tools
3. Working with changes
4. Communication with the client
Mistake 1: Overly detailed planning at the start
Problem: Attempting to plan the entire project down to the smallest detail.
Solution: Plan in detail only the first 2-3 sprints, the rest at the epic level.
Mistake 2: Ignoring changes for the sake of the budget
Problem: Refusing important changes out of fear of exceeding the budget.
Solution: Changes are an investment in product quality. Better to remove a less important feature.
Mistake 3: Lack of metrics
Problem: It’s impossible to understand how effectively the budget is spent.
Solution: Implement metrics: cost per story point, team velocity, ROI by features.
The combination of Agile and fixed budget requires a change in approach both from the executor and the client. Key success principles:
With the right approach, Agile with a fixed budget delivers better results than traditional waterfall: higher product quality, greater client satisfaction, and fewer technical risks.
The company Meta-Sistem specializes in developing corporate information systems using modern project management methodologies.
Our 15 years of experience in the IT industry allows us to successfully combine the flexibility of Agile development with strict budget requirements of clients.
Our advantages: